Stock is the starting point for small orders
A smaller initial order can be a practical way to build a range. Send the references and quantity for each piece, along with the delivery country. Availability is checked for the actual design, rather than assumed for every item in a collection.
Handmade production starts at 1,000 pieces
The minimum for handmade production depends on the complexity of the shape and finish. A stock piece, a new production run and a newly developed shape are different purchasing routes. Describe which route you need when requesting a quotation.
Include the full project
Logo decoration, gift packaging, mixed assortments and delivery destinations all influence the quotation. Share them together so the glassware and packaging can be planned as a single project.





